**Kit shown in Blue Oyster for example purposes only. This kit comes in the Molten Brown Burst finish**

The ideal ratio of walnut to birch produces superior quality of low-to-mid frequency warmth to perfectly complement the clear attack and higher frequency projection of birch making this sound familiar, but distinctively different from Tama sounds of the past. The Starclassic series continues to be a representation of Tama's collective drum-making passion, wisdom and pursuit to offer refined and differentiated sounds. Starclassic Walnut/Birch defines Tama's commitment to evolve drum sounds and inspire the contemporary drummer. Available in Lacquer Artic Blue Oyster, Lacquer Ocean Blue Ripple, Lacquer Phantasm Oyster, Molten Brown Burst, Piano Black, Satin Burgundy Fade, Satin Sapphire Fade, and Transparent Mocha Fade.

Includes

  • 16"x22" Bass Drum
  • 8"x10" Tom Tom
  • 9"x12" Tom Tom
  • 12"x14" Floor Tom
  • 14"x16" Floor Tom
  • MTH1000 Double Tom Holder
  • Snares not included
  • See 3rd picture of listing for a graphic of items included

Reverb Buyer Protection

Reverb has your back if your item is lost, damaged, or doesn't match its description. Simply report any issues within 7 days and we'll help you get a full refund.Learn more about Reverb Buyer Protection.

ConditionMint (Used)
Mint items are in essentially new original condition but have been opened or played.Learn more
Brand
Model
  • WBS52LS-MBR Starclassic Walnut/Birch 10x8/12x9/14x12/16x14/22x16" 5pc Shell Pack
Categories
Shell Material
  • Birch
  • Walnut

Product safety information may be available here.

The Full Compass Gear Locker

Verona, WI, United States
Joined Reverb:2014

Reverb Protection

Simple Returns, Secure Transactions, Human Support

Learn more

Secure Checkout

Promoted similar listings













Product reviews

Reverb Gives

Your purchases help youth music programs get the gear they need to make music.

Oops, looks like you forgot something. Please check the fields highlighted in red.