Controls4 Dynamic curves, Aftertouch, Portamento, Legato Mono/Poly, Transposer -/+ 24, Octave +/- 2, Expression Pedal with 6 curvesFactory Sounds10 Voice groups: Piano, Strings, Organ, Brass, Sax, Pad, Synth, Guitar, Bass, Ethnic.
464 Preset Voices, Voice 1 and Voice 2 with up to 3 different sounds each.
Drawbars, Factory Advanced Voice Editing, High-quality multilayer Sounds with Real Solos®.
Up to 1,280 User Voices, Arabic scale and key shift programmable per Voice.User Sounds2.5 GB free storage in non-volatile Flash memory (1.5 GB for additional Factory Sound Banks, 1 GB for User samples).
Sample Editor: up to 228,480 samples (mono, usable 8,192, max 6 seconds per sample).
Advanced editor with Split, Octave, Level, Range, Tune, Cut Off, Velocity, ADSR. Sample Loop utilities.
User Drum kits.ADSR/FilterSeparate sound controls for Attack, Decay, Sustain, LFO, Cut Off, and ResonanceDrum Set62 Stereo Drum kits, 32 User Drum kits with Remap, Filter, Tune, FX controls.
Drum Mixer: 9 sections with controls for level, pan, reverb, pitch, velocity compression.
86 MIDI Drum styles (Patterns) available.Drawbars9 digital drawbars, Slow-Fast Rotor, Overdrive, Click, Vibrato, Reverb, Percussion.
Full Editing, 24 Organ Presets, Twin Organ functionality.ArrangerOver 500 Styles (Real, Live, and MIDI).
10 groups: Ballad, Pop, Dance, Rock, Swing, Latin, Country, Folk, Party, Unplugged.
Features: 3 Intro, 3 Ending, Fill to End, ABCD, 4 Fills, 4 Break, Reintro, Count In, Pause, Key Start/Stop, Variation.
User Styles with unlimited storage.Live Drums580 Live Drums with complete Arranger structure (3 Intros, 3 Endings, ABCD, 4 Fills, 4 Breaks).
Drum Boost, Reverb, and 3-band Parametric EQ with 10 presets.
Drum Lock and support for external User Live Drums.Grooves3 independent Groove sections.
Library of over 780 Latin percussion, Electro, and Acoustic Drum loops, with separate volume and EFX controls.Live Guitars216 sliced Guitar patterns, including Long Chords, with separate volume and EFX controls.Real ChordOver 300 Real audio accompaniments (up to 13 different chords).
Electric, acoustic, and jazz guitar patterns synchronized to MIDI with dedicated Insert EFX.Real Bass256 Real audio Basses synchronized to MIDI.
Twin Bass functionality, support for external User audio Basses.
3-band Parametric EQ with 10 presets.Style ModelingNavigate and choose Drums, Grooves, Bass, and Chords from massive MIDI and Audio libraries.Style EditAdvanced pattern recording and editing: Copy, Quantize, Velocity, Octave functions.
Special quantize for oriental styles (7/8, 9/8, 13/8, etc.).Registrations4 Banks with unlimited Registrations for global setup control.PerformanceFast access to Styles, Registrations with Style, MP3, WAV, or MIDI files.DSPEffects: Reverb, Chorus, Phaser, Flanger, Overdrive, Distortion, Tremolo, Autopan, Equalizer.
2 stereo EFX Inserts for Voice, 1 for Arranger chords, 1 for Real Chord.
64 Single Presets and 64 Chain Effects with deep editing.Stem4 Scenes with 5 audio tracks per scene.
Features: Transpose, Time Stretching, Loop, Solo, Mute, Autoplay, Fixed pitch for Drum section.Player2 Player units with features like Transpose, Time Stretching, GM, Jukebox, Playlists.
Supports WAV, MIDI, MP3, MP4, AVI, MOV, FLV, CDG, JPG, PNG, TXT, PDF files.HD Recording1 stereo audio track. MIDI and Song Style recording.Audio Multitrack5+1 audio tracks.InputsMicro input (XLR) with phantom power (48V) and gain control.
Second input (TRS) for microphone, line, and instrument level signals with volume and reverb control.Voicetron3-voice vocalizer, assignable to Arranger or MIDI file with Presets, Equalizer, Mode functions.VideoHDMI connection for lyrics, pictures, and videos (up to Full HD).BluetoothStreaming audio input (A2DP profile).Wi-FiRemote control via VNC (Wi-Fi direct).LANRemote control via Ethernet cable (direct connection or DHCP).Storage240 GB internal SSD (80 GB reserved for System), optional SD Card (up to 512 GB).ConnectionsFront: Headphones, Input, Micro with direct output.
Rear: Main Out L/R, Sustain Pedal, Volume Pedal, MIDI In/Out/Thru, USB Device, USB Host, HDMI, Ethernet.OptionalVolume Pedal, Sustain Pedal, Footswitch, MIDI Pedalboard, Touchscreen Monitor, Backpack.Dimensions / Weight27 x 20 x 6 cm (10.6 x 7.8 x 2.3 in) / 2 kg (4.1 lbs.)
Dieser Artikel wird verkauft "wie beschrieben"
Dieser Artikel wird verkauft "wie beschrieben" und kann nicht retourniert werden, es sei denn er kommt anders als beschrieben oder fotografiert an. Artikel müssen im Originalzustand mit allen gelieferten Teilen und Zubehör in ursprünglicher Verpackung zurückgesendet werden.Mehr erfahren
| Zustand | Brandneu (Neu) Brandneue Artikel werden von autorisierten Händlern oder Herstellern verkauft und kommen in originaler Verpackung.Weitere Informationen |
|---|---|
| Marke | |
| Modell |
|
| Kategorien | |
| Hergestellt in |
|
Möglicherweise sind hier Informationen zur Produktsicherheit verfügbar.





