**Kit shown in Blue Oyster for example purposes only. This kit comes in the Molten Brown Burst finish**
The ideal ratio of walnut to birch produces superior quality of low-to-mid frequency warmth to perfectly complement the clear attack and higher frequency projection of birch making this sound familiar, but distinctively different from Tama sounds of the past. The Starclassic series continues to be a representation of Tama's collective drum-making passion, wisdom and pursuit to offer refined and differentiated sounds. Starclassic Walnut/Birch defines Tama's commitment to evolve drum sounds and inspire the contemporary drummer. Available in Lacquer Artic Blue Oyster, Lacquer Ocean Blue Ripple, Lacquer Phantasm Oyster, Molten Brown Burst, Piano Black, Satin Burgundy Fade, Satin Sapphire Fade, and Transparent Mocha Fade.
Includes
- 16"x22" Bass Drum
- 8"x10" Tom Tom
- 9"x12" Tom Tom
- 12"x14" Floor Tom
- 14"x16" Floor Tom
- MTH1000 Double Tom Holder
- Snares not included
- See 3rd picture of listing for a graphic of items included
| Condition | Brand New (New) Brand New items are sold by an authorized dealer or original builder and include all original packaging.Learn more |
|---|---|
| Brand | |
| Model |
|
| Categories | |
| Shell Material |
|
Product safety information may be available here.





