***Please check my Reverb Store for many more premium used gear listings!***


Up for sale is a vintage/original Mesa Boogie Mark IIC+ SRG 1x12 Combo. If you're looking, not much needs to be said - absolute legend of an amp, with the 60 watt SRG being the most aggressive of the Mark IIC+ configurations. The chassis is housed in an original Mesa 1x12 combo cabinet with vintage Mesa/Black Shadow labeled EVM-12L speaker.

The amp is fully functional, and in very good condition. The chassis/amp is very clean, and has been through full service with Mike B. at Mesa in 2021 (including recap), with paperwork included for your records. The combo has some minor wear, but is fully functional, and absolutely RIPS with the EVM-12L. Don't miss your chance to own a piece of Mesa Boogie history right here (especially with Mike B. no longer being part of he company).

I describe my gear fully/accurately, and am happy to answer any questions you may have. However, please ask all question before purchasing. I am not a store, so I can not accept returns for someone changing their mind. In this light, all sales are final.


This item is sold As-Described

This item is sold As-Described and cannot be returned unless it arrives in a condition different from how it was described or photographed. Items must be returned in original, as-shipped condition with all original packaging.Learn More.

Listed3 months ago
ConditionVery Good (Used)
Very Good items may show a few slight marks or scratches but are fully functional and in overall great shape.Learn more
Brand
Model
  • Mark II C+ 2-Channel 60-Watt 1x12" Guitar Combo
Categories
Made In
  • United States
Number of Inputs
  • 1 Input
Power Tube Type
  • 6L6
Number of Channels
  • 2 Channels
Built-In Effects
  • Built-In Effects
Speaker Configuration
  • 1x12"
Electronics
  • Tube
Reverb
  • Spring Reverb
Output Power (Watts)
  • 60

Product safety information may be available here.

The Guitar Rack

Tucson, AZ, United States
Joined Reverb:2014

Reverb Protection

Simple Returns, Secure Transactions, Human Support

Learn more

Secure Checkout

Promoted similar listings













Product reviews

Reverb Gives

Your purchases help youth music programs get the gear they need to make music.

Oops, looks like you forgot something. Please check the fields highlighted in red.