Today, Lawman Guitars is Presenting...
A really cool Dimarzio Humbucker from the 1970's.
We got this in a box of parts from a since closed music shop. We tested it on our meter at 5.42K Ohms. It has a really long lead wire of over 12 inches. We are unsure of the model of the pickup or the date. We are dating it to the 1970's from the standard screw heads on the back side of the pickup cover.
Cool pickup for your Les Paul or any other USA guitar. Sold as is but it's registering a reading. No returns..Thanks for respecting that.
Be sure to check out the cool vintage guitars, parts and gear in our Reverb Shop!
Lawman Mike at Lawman Guitars
A really cool Dimarzio Humbucker from the 1970's.
We got this in a box of parts from a since closed music shop. We tested it on our meter at 5.42K Ohms. It has a really long lead wire of over 12 inches. We are unsure of the model of the pickup or the date. We are dating it to the 1970's from the standard screw heads on the back side of the pickup cover.
Cool pickup for your Les Paul or any other USA guitar. Sold as is but it's registering a reading. No returns..Thanks for respecting that.
Be sure to check out the cool vintage guitars, parts and gear in our Reverb Shop!
Lawman Mike at Lawman Guitars
This item is sold As-Described
This item is sold As-Described and cannot be returned unless it arrives in a condition different from how it was described or photographed. Items must be returned in original, as-shipped condition with all original packaging.Learn More.
| Listed | 5 years ago |
|---|---|
| Condition | Very Good (Used) Very Good items may show a few slight marks or scratches but are fully functional and in overall great shape.Learn more |
| Brand | |
| Model |
|
| Categories | |
| Made In |
|
Product safety information may be available here.






