Here's a very nice and clean Seymour Duncan HSS Pickup Set that's perfect for your Strat, Super Strat, or similar style guitar. Included is a TB-4 (F-Spaced, 52.6mm) JB Trembucker for the bridge, and two Classic Stack stacked single coil STK-S1Ns for the neck and middle position. each pickup has 4-conductor leads with plenty of length for most any strat style application.
- Bridge - TB-4 JB Trembucker, 6"+ 4-Conductor Lead, 17.5 kΩ
- Middle - STK-S1n - Classic Stack, nearly 9" 4-Conductor Lead, 12.78 kΩ
- Neck - STK-S1n - Classic Stack, Nearly 11" 4-Conductor Lead, 13.26 kΩ
The TB-4 JB Trembucker comes complete with springs and screws.
| Listed | 8 years ago |
|---|---|
| Condition | Excellent (Used) Excellent items are almost entirely free from blemishes and other visual defects and have been played or used with the utmost care.Learn more |
| Brand | |
| Model |
|
| Finish |
|
| Categories | |
| Made In |
|
Product safety information may be available here.








