Here's a very nice and clean Seymour Duncan HSS Pickup Set that's perfect for your Strat, Super Strat, or similar style guitar. Included is a TB-4 (F-Spaced, 52.6mm) JB Trembucker for the bridge, and two Classic Stack stacked single coil STK-S1Ns for the neck and middle position. each pickup has 4-conductor leads with plenty of length for most any strat style application.
- Bridge - TB-4 JB Trembucker, 6"+ 4-Conductor Lead, 17.5 kΩ
- Middle - STK-S1n - Classic Stack, nearly 9" 4-Conductor Lead, 12.78 kΩ
- Neck - STK-S1n - Classic Stack, Nearly 11" 4-Conductor Lead, 13.26 kΩ
The TB-4 JB Trembucker comes complete with springs and screws.
Reverb Buyer Protection
Reverb has your back if your item is lost, damaged, or doesn't match its description. Simply report any issues within 7 days and we'll help you get a full refund.Learn more about Reverb Buyer Protection.
Listed | 6 years ago |
Condition | Excellent (Used) Excellent items are almost entirely free from blemishes and other visual defects and have been played or used with the utmost care.Learn more |
Brand | |
Model |
|
Finish |
|
Categories | |
Made In |
|