Hello! Here we have a 300w , 12 inch , 8ohm, EVM 12 L Black Label Society speaker in excellent condition. These speakers are getting hard to find. Very LITTLE play time and 100% sounds and functions as it should. Speaker will be packed, shipped and insured in original EVM boxes. (double boxed)
speaker is PERFECT for a 1x12 cabinet and a 100 watt tube head
speaker is PERFECT for a 1x12 cabinet and a 100 watt tube head
This item is sold As-Described
This item is sold As-Described and cannot be returned unless it arrives in a condition different from how it was described or photographed. Items must be returned in original, as-shipped condition with all original packaging.Learn More.
| Listed | 8 years ago |
|---|---|
| Condition | Excellent (Used) Excellent items are almost entirely free from blemishes and other visual defects and have been played or used with the utmost care.Learn more |
| Brand | |
| Model |
|
| Finish |
|
| Categories | |
| Year |
|
Product safety information may be available here.






